TITLE: 2nd Shift Skid Maker/Wrapper DEPT: Sheets
Hours: 1:00 p.m. - 9:00 p.m.
Assemble skids for production. Then wrap finished products on skids with the best possible quality and speed.
JOB FUNCTIONS:
TOOLS, EQUPIMENT \& MEASURING INSTRUMENTS:
Table Saw, Nail gun, banding equipment, measuring tape.
PHYSICAL DEMAND:
Must be able to constantly lift 50 lbs. unassisted. Requires constant squatting and kneeling. Requires Standing all day.